4th January 2014
We were asked to develop a solution for a replacement landing stage for a prestigious local hotel. There were many challenges to overcome with this project from survey to manufacture, installation and commissioning. Each challenge and following solution raised another challenge. Our solution was to laser scan the area of the fort and developed a design with the help of LOC in Aberdeen and Ramboll consulting in Southampton who provided the wave force calculations. The team then manufactured and installed complete on time and on budget. A credit to the team of engineers, draftsman, fabrication operatives and installation engineers who all played a vital role in the completion of this unusual and difficult project.